Contact Us
-
Cell/WhatsApp: +86-135-2669-2320
-
Phone: +86-371-56771821
-
E-mail:
market@doingmachinery.com
News
-
DOING News
-
Industry News
Product
Project Case
-
DOING® Group|100 TPD Continuous Tire Pyrolysis Plants Installed for Repeat Client in China
-
Customized 1 Ton/Day Continuous Plastic Pyrolysis System Delivered for Korean Client
-
DOING DY-15 Waste Tire Pyrolysis Machine Project Successfully Installed in Kenya
-
DOING 45,000 Tons/Year Waste Plastic Pyrolysis Project in Vietnam Successfully Commissioned
-
DOING Tire & Plastic Pyrolysis Distillation Plant Successfully Installed in Fiji
-
DOING 50TPD Continuous Oil Sludge Pyrolysis Production Line Successfully Installed in China
-
DOING Installed 15-Ton Tank Bottom Sludge Pyrolysis Equipment for Colombian Repeat Client
-
DOING 30TPD Mazut Oil Distillation Plant Successfully Installed in Kazakhstan
-
-
DOING Three 15-ton Batch Tire Pyrolysis Units in Myanmar On-site Installation Experience
To install waste tire pyrolysis plant in Columbia
2016-03-31 / DOING News / Leave Message / Chat Online
Januaray12,2016, our factory deliverred two sets of waste tire pyrolysis plants for our Columbia customers. The waste tire pyrolysis plant for our Columbia customer is the newest design pyrolysis plants which can help our customer extract fuel oil, black carbons and steel wires from tires/plastics/rubbers. And in order to improve the efficiency of waste tire pyrolysis plant, he also bought automatic feeder machine to save feeding time. What's more, to enlarge the profits from waste tire pyrolysis plant, he bought carbon black briquette machine.
Now our customer has successfully build the foundation according to our guide, and when our engineer arrives at his factory, they will finish installation very soon.
Here is a picture of waste tire pyrolysis plant foundation in his place,let us have a look:

Waste tire pyrolysis plant foundation
Leave A Message
Please feel free to leave your contacts here and your privacy is protected. A competitive quotation will be provided according to your detailed requirement within one business day.

