Contact Us
-
Cell/WhatsApp: +86-135-2669-2320
-
Phone: +86-371-56771821
-
E-mail: market@doingmachinery.com
Video
-
PLC control fully continuous pyrolysis technology 3D working video
-
14Ton waste oil recycling machine in Indonesia operation site
-
Fully continuous tire pyrolysis plant working process 1: waste tire pre-treatment
-
Semi-continuous tire pyrolysis machine process flow 3D video
-
Waste Oil Sludge Thermal Decomposition Units(TDU) Running Site Live Video
-
50TPD fully continuous tyre pyrolysis plant in India display video
-
Three types of DOING waste tire pyrolysis plants real shot display video
-
Fully continuous waste tire pyrolysis plant project installed by DOING introduction video
-
-
12 sets of 12tpd waste tire pyrolysis plants installed in China video
Product
Project Case
-
DOING 15 TPD semi-continuous tire pyrolysis equipment installed in Indonesia
-
DOING 15TPD semi-continuous pyrolysis plant was installed in Brazil
-
1TPD Waste Oil to Diesel Refinery Machine Operation Site in Thailand
-
Transforming Paper Mill Plastic Waste into Diesel Plant Installed in Mexico
-
-
-
DOING Waste tyre to diesel recycling plants were successfully installed in Japan
-
Waste tire to diesel recycling plant was put into operation in South Africa
-
14MTPD Capacity of Waste oil recycling refinery plant project in Ghana
-
Continuous rubber tyre pyrolysis machine installed in Liaoning,China
Oversized OTR tyres pretreated before put into pyrolysis reactor in Chile
2019-05-29 / Video / Get Price / Chat Online
The customer from Chile bought waste tyre pyrolysis plants from us and want to process oversized engineering tyres. If put them into the waste tyre pyrolysis plant, there would be a lot of space to waste. To process more tyres one batch, the tyre pretreatment is necessary. In the video above, the customer is preprocessing the oversized engineering tyres for high efficiency.
Leave A Message
Please feel free to leave your contacts here and your privacy is protected. A competitive quotation will be provided according to your detailed requirement within one business day.